Commit Graph
1 Commits
Author SHA1 Message Date
Nick aa9750c59f feat(v1): self-scaffold + self-scaffolded upgrade + graph projection + convergence (T18 18M-18Q)
- 18O: ONE canonical structural Scaffold of Scaffolding itself
  (store/scaffold/structural.json — 31 entities, 46 authority-graded
  relationships: domains/subsystems/components with real source paths,
  state stores, verification, deployment, the bounded build_mode
  adapter marked legacy_of). 5 consistency held-outs: sources exist,
  no duplicate truth with Spine, legacy not hidden, schema known to
  consent machinery.
- 18P SELF-SCAFFOLDED UPGRADE PROOF: contract 18q-graph-projection
  driven end-to-end FROM the maintained scaffold — structural lookup →
  contextually-generated research plan → qualified Build Basis →
  impact closure → visible preview → contract+workspace record →
  event-bridged verification (resumed via event, verdict success) →
  authority re-read → scaffold updated by the model itself → closed.
  All 11 steps scaffold-driven; zero architecture rediscovery.
- 18Q: graph_projection.py — stable versioned READ-ONLY projection
  (JSON/DOT/Mermaid) over structural truth; never an authority. 4
  held-outs incl. read-only proof.
- 18N generalisation: adversarial paraphrase families (37 unseen
  phrases across 6 tests) found and fixed 4 REAL semantic gaps:
  negation frames, idiom-prefix imperatives, modal+proposal referent
  ordering, all-stale-proposals fallthrough, preceding-context
  relative-that disambiguation.
- 18M full backend convergence: /build start now MINTS a canonical
  Construction Contract (classified) before BuildManager — no route
  runs an independent construction state machine.

Suite 1966 green; ratchets PASS.
2026-09-15 23:33:42 +01:00