INFRA-1 acceptance: native merge API after 1.27.3 upgrade #307

Merged
conductor merged 1 commits from infra1-accept into master 2026-09-09 17:53:33 +01:00
Owner

Controlled acceptance PR (disposable). Robot disabled; merge via native API call only.

Controlled acceptance PR (disposable). Robot disabled; merge via native API call only.
conductor added 1 commit 2026-09-09 17:51:22 +01:00
chore(infra1): acceptance PR — native merge API after Gitea 1.27.3 upgrade
Auto-label / priority-gate (pull_request) Skipped
Auto-label / auto-label (pull_request) Successful in 1s
CI Pipeline / best-practices (pull_request) Successful in 2s
CI Pipeline / documentation (pull_request) Successful in 3s
CI Pipeline / lint (pull_request) Successful in 35s
CI Pipeline / canary (pull_request) Successful in 33s
CI Pipeline / unit-tests (pull_request) Successful in 53s
CI Pipeline / gitea-offline (pull_request) Successful in 15s
CI Pipeline / type-check (pull_request) Successful in 29s
CI Pipeline / required-checks (pull_request) Successful in 1s
Spec gate (headless) / spec-gate (pull_request) Successful in 7s
Auto-version and Release / release (pull_request) Successful in 34s
CI Pipeline / best-practices (push) Successful in 3s
CI Pipeline / documentation (push) Successful in 2s
CI Pipeline / gitea-offline (push) Successful in 14s
CI Pipeline / lint (push) Failing after 37s
CI Pipeline / canary (push) Failing after 47s
CI Pipeline / type-check (push) Successful in 37s
CI Pipeline / unit-tests (push) Failing after 1m14s
CI Pipeline / required-checks (push) Successful in 6s
897fd1d74f

🤖 Headless spec gate (non-blocking, #204 first slice)

Spec-gate agent produced no text output — check runner logs.

Deterministic floors still govern the merge

This comment is advisory. Required checks (lint, tests, canaries, type-check, coverage, dependency lock, impact gate) remain the merge authority per docs/adversarial-review.md proportionality.

🤖 **Headless spec gate (non-blocking, #204 first slice)** Spec-gate agent produced no text output — check runner logs. <details><summary>Deterministic floors still govern the merge</summary> This comment is advisory. Required checks (lint, tests, canaries, type-check, coverage, dependency lock, impact gate) remain the merge authority per docs/adversarial-review.md proportionality.</details>
conductor merged commit e7b7aa2b10 into master 2026-09-09 17:53:33 +01:00
Sign in to join this conversation.