chore: trigger release (conductor push-whitelisted) #243

Merged
conductor merged 1 commits from trigger-bump-2 into master 2026-09-08 06:40:23 +01:00
Owner

Fires auto-version → direct-commit bump with ROBOT_TOKEN + push whitelist.

Fires auto-version → direct-commit bump with ROBOT_TOKEN + push whitelist.
conductor added 1 commit 2026-09-08 06:38:24 +01:00
chore: trigger release — conductor push-whitelisted, direct-commit bump unblocked
Auto-label / priority-gate (pull_request) Skipped
CI Pipeline / best-practices (push) Successful in 4s
Auto-label / auto-label (pull_request) Successful in 2s
CI Pipeline / documentation (push) Successful in 2s
CI Pipeline / canary (push) Failing after 28s
CI Pipeline / lint (push) Successful in 31s
CI Pipeline / type-check (push) Successful in 25s
CI Pipeline / gitea-offline (push) Successful in 14s
CI Pipeline / unit-tests (push) Successful in 48s
CI Pipeline / best-practices (pull_request) Successful in 2s
CI Pipeline / documentation (pull_request) Successful in 3s
CI Pipeline / lint (pull_request) Successful in 29s
CI Pipeline / canary (pull_request) Failing after 29s
CI Pipeline / gitea-offline (pull_request) Successful in 14s
CI Pipeline / required-checks (push) Successful in 1s
Spec gate (headless) / spec-gate (pull_request) Successful in 4s
CI Pipeline / unit-tests (pull_request) Successful in 44s
CI Pipeline / type-check (pull_request) Successful in 25s
CI Pipeline / required-checks (pull_request) Successful in 1s
Auto-version and Release / release (pull_request) Failing after 24s
656afa07c6

🤖 Headless spec gate (non-blocking, #204 first slice)

Spec-gate agent produced no text output — check runner logs.

Deterministic floors still govern the merge

This comment is advisory. Required checks (lint, tests, canaries, type-check, coverage, dependency lock, impact gate) remain the merge authority per docs/adversarial-review.md proportionality.

🤖 **Headless spec gate (non-blocking, #204 first slice)** Spec-gate agent produced no text output — check runner logs. <details><summary>Deterministic floors still govern the merge</summary> This comment is advisory. Required checks (lint, tests, canaries, type-check, coverage, dependency lock, impact gate) remain the merge authority per docs/adversarial-review.md proportionality.</details>
conductor merged commit f5d8ab15bc into master 2026-09-08 06:40:23 +01:00
Sign in to join this conversation.