Scaffold: programme_continuation wired into close() (T5.15 slice 3) + same-second id fix #2473

Merged
conductor merged 1 commits from feat/wire-programme-continuation into master 2026-10-06 03:52:17 +01:00
1 Commits
Author SHA1 Message Date
Nick 0873b521e3 feat(scaffold): programme_continuation wired into close() (T5.15 slice 3) + same-second contract-id collision fix
deploy / deploy (push) Skipped
CI Pipeline / go-surface (push) Successful in 4s
CI Pipeline / best-practices (push) Successful in 2s
CI Pipeline / documentation (push) Successful in 2s
Auto-label / priority-gate (pull_request) Skipped
CI Pipeline / type-check (push) Successful in 29s
CI Pipeline / lint (push) Successful in 39s
Auto-label / auto-label (pull_request) Successful in 0s
CI Pipeline / gitea-offline (push) Successful in 13s
CI Pipeline / canary (push) Successful in 53s
CI Pipeline / go-surface (pull_request) Successful in 2s
CI Pipeline / lint (pull_request) Successful in 36s
CI Pipeline / best-practices (pull_request) Successful in 1s
CI Pipeline / documentation (pull_request) Successful in 2s
CI Pipeline / canary (pull_request) Successful in 41s
CI Pipeline / type-check (pull_request) Successful in 27s
CI Pipeline / gitea-offline (pull_request) Successful in 13s
Spec gate (headless) / spec-gate (pull_request) Successful in 4s
CI Pipeline / unit-tests (push) Successful in 4m59s
CI Pipeline / required-checks (push) Successful in 0s
CI Pipeline / CI Pipeline / notify-event-bridge (push) Successful in 2s
CI Pipeline / unit-tests (pull_request) Successful in 4m54s
CI Pipeline / required-checks (pull_request) Successful in 0s
CI Pipeline / CI Pipeline / notify-event-bridge (pull_request) Successful in 1s
Auto-version and Release / release (pull_request) Successful in 5s
Slice 3 of the completion wave: closing a contract that is a stage of a persisted Programme marks that stage COMPLETE, persists the ledger, and rides the continuation canary on the close envelope — the next eligible stage is SURFACED, never guessed (task done ≠ programme done). No programme bound → no continuation block; ledger failure degrades without failing the closure. Three contracts. Also fixed en route: contract ids were second-granularity timestamps that collided when two needs filed in the same second (red test proves distinct ids now, uuid suffix added).
2026-10-06 03:46:24 +01:00