chore(t21.5): final gate evidence (G13/G14, MINOR 0.4.0, PATCH 1.0.4) #330

Merged
conductor merged 1 commits from t21.5-gate-evidence into master 2026-09-17 14:36:15 +01:00
Owner

T21.5 final gate evidence: G13 material-change/regression, G14 final test gates, event-wait-resume MINOR 0.4.0, scaffolding-v1 PATCH 1.0.4.

Propagation: ledger/gate evidence only, no code paths; no umbrella changes; dependents unaffected.

T21.5 final gate evidence: G13 material-change/regression, G14 final test gates, event-wait-resume MINOR 0.4.0, scaffolding-v1 PATCH 1.0.4. Propagation: ledger/gate evidence only, no code paths; no umbrella changes; dependents unaffected.
conductor added 1 commit 2026-09-17 14:30:15 +01:00
chore(t21.5): gate evidence G13/G14 + event-wait-resume MINOR 0.4.0 + scaffolding-v1 PATCH 1.0.4
CI Pipeline / best-practices (push) Successful in 11s
CI Pipeline / documentation (push) Successful in 6s
Auto-label / auto-label (pull_request) Successful in 5s
CI Pipeline / canary (push) Successful in 36s
Auto-label / priority-gate (pull_request) Skipped
CI Pipeline / lint (push) Successful in 45s
deploy / deploy (push) Skipped
CI Pipeline / gitea-offline (push) Successful in 16s
CI Pipeline / type-check (push) Successful in 33s
CI Pipeline / documentation (pull_request) Successful in 7s
CI Pipeline / best-practices (pull_request) Successful in 7s
CI Pipeline / lint (pull_request) Successful in 43s
CI Pipeline / gitea-offline (pull_request) Successful in 18s
Spec gate (headless) / spec-gate (pull_request) Successful in 16s
CI Pipeline / type-check (pull_request) Successful in 33s
CI Pipeline / canary (pull_request) Successful in 33s
CI Pipeline / unit-tests (push) Successful in 3m8s
CI Pipeline / required-checks (push) Successful in 1s
CI Pipeline / CI Pipeline / notify-event-bridge (push) Successful in 6s
CI Pipeline / unit-tests (pull_request) Successful in 3m21s
CI Pipeline / required-checks (pull_request) Successful in 1s
CI Pipeline / CI Pipeline / notify-event-bridge (pull_request) Successful in 5s
Auto-version and Release / release (pull_request) Successful in 1m0s
7008743620
gitea-actions Bot added the infrastructure label 2026-09-17 14:30:32 +01:00

🤖 Headless spec gate (non-blocking, #204 first slice)

Spec-gate agent produced no text output — check runner logs.

Deterministic floors still govern the merge

This comment is advisory. Required checks (lint, tests, canaries, type-check, coverage, dependency lock, impact gate) remain the merge authority per docs/adversarial-review.md proportionality.

🤖 **Headless spec gate (non-blocking, #204 first slice)** Spec-gate agent produced no text output — check runner logs. <details><summary>Deterministic floors still govern the merge</summary> This comment is advisory. Required checks (lint, tests, canaries, type-check, coverage, dependency lock, impact gate) remain the merge authority per docs/adversarial-review.md proportionality.</details>
conductor merged commit e6451a5afc into master 2026-09-17 14:36:15 +01:00
Sign in to join this conversation.
No Reviewers
2 Participants
Notifications
Due Date
No due date set.
Dependencies

No dependencies set.

Reference: conductor/rune#330