R13/M9 PR-flow live proof (harmless docs marker) #353

Merged
conductor merged 1 commits from r13-m9-pr-proof into master 2026-09-19 18:02:46 +01:00
Owner

In plain English: a marker commit proving the PR wait flow end to end

What is this about: One harmless documentation line, used as the live test object for the final async-continuation proofs (R13/M9) on the PC-local forge.

Why do we need it: The gate ledger requires a real PR-flow continuation proof; this PR is that proof.

Why is it still open: Awaiting its own CI via one canonical await-operation invocation.

What would let us close this

  • CI terminal via single await-operation (no polls, no sleeps, no re-arms)
  • Merge after proof metrics recorded

Version impact

  • none — documentation marker only

Technical details

  • marker only; source sha recorded in proof evidence
# In plain English: a marker commit proving the PR wait flow end to end **What is this about:** One harmless documentation line, used as the live test object for the final async-continuation proofs (R13/M9) on the PC-local forge. **Why do we need it:** The gate ledger requires a real PR-flow continuation proof; this PR is that proof. **Why is it still open:** Awaiting its own CI via one canonical await-operation invocation. # What would let us close this - [ ] CI terminal via single await-operation (no polls, no sleeps, no re-arms) - [ ] Merge after proof metrics recorded # Version impact - [x] none — documentation marker only # Technical details - marker only; source sha recorded in proof evidence
conductor added 1 commit 2026-09-19 17:57:34 +01:00
docs: R13/M9 PR-flow live proof marker (harmless, no code change)
Auto-label / priority-gate (pull_request) Skipped
Auto-label / auto-label (pull_request) Successful in 1s
CI Pipeline / best-practices (pull_request) Successful in 3s
CI Pipeline / documentation (pull_request) Successful in 1s
CI Pipeline / canary (pull_request) Successful in 28s
CI Pipeline / type-check (pull_request) Successful in 26s
CI Pipeline / lint (pull_request) Successful in 34s
Spec gate (headless) / spec-gate (pull_request) Successful in 3s
CI Pipeline / gitea-offline (pull_request) Successful in 13s
CI Pipeline / lint (push) Successful in 32s
CI Pipeline / best-practices (push) Successful in 2s
CI Pipeline / canary (push) Successful in 28s
CI Pipeline / documentation (push) Successful in 1s
CI Pipeline / gitea-offline (push) Successful in 13s
deploy / deploy (push) Skipped
CI Pipeline / type-check (push) Successful in 26s
CI Pipeline / unit-tests (pull_request) Successful in 4m24s
CI Pipeline / required-checks (pull_request) Successful in 1s
CI Pipeline / CI Pipeline / notify-event-bridge (pull_request) Successful in 2s
CI Pipeline / unit-tests (push) Successful in 4m22s
CI Pipeline / required-checks (push) Successful in 0s
CI Pipeline / CI Pipeline / notify-event-bridge (push) Successful in 2s
Auto-version and Release / release (pull_request) Successful in 6s
80ed978fbf

🤖 Headless spec gate (non-blocking, #204 first slice)

Spec-gate agent produced no text output — check runner logs.

Deterministic floors still govern the merge

This comment is advisory. Required checks (lint, tests, canaries, type-check, coverage, dependency lock, impact gate) remain the merge authority per docs/adversarial-review.md proportionality.

🤖 **Headless spec gate (non-blocking, #204 first slice)** Spec-gate agent produced no text output — check runner logs. <details><summary>Deterministic floors still govern the merge</summary> This comment is advisory. Required checks (lint, tests, canaries, type-check, coverage, dependency lock, impact gate) remain the merge authority per docs/adversarial-review.md proportionality.</details>
conductor merged commit 9db580ac6d into master 2026-09-19 18:02:46 +01:00
Sign in to join this conversation.