Memory Research Atlas — Pre-T1 [EPIC] #356

Open
opened 2026-09-19 21:14:49 +01:00 by conductor · 15 comments
Owner

CLOSED — RESEARCH COMPLETE, IMPLEMENTATION DEFERRED (Nick disposition, 2026-10-08).

The atlas survey ran its bounded waves and the corpus is on disk (research/ — wave1, wave1-language-fit, research-methodology, rune-efficiency, textual-craft, tool-calling, uncensored-models, safety-override, quality-tools, workflow-audit, batch-processing, build-mode, contract-testing, interstitial-tools, process_experiences.jsonl). The requirement-coverage work the closure criterion asked for is satisfied at the survey level; every domain reached research-complete, explicit deferral, or documented follow-up.

Per-domain closing notes carry the specifics. The IMPLEMENTATION of atlas findings is explicitly deferred to a later programme — the shipped architecture (R2/Phase G kernels, the recall pipeline, the spine) already incorporates the survey's load-bearing conclusions; the novel-architecture findings wait in the corpus for the commissioned implementation cycle.

Companion deliverable from the same wave: #411's harness invariants (commit 960af2f) — the repair classes from the research wave are now deterministic checks any future research run can execute.

CLOSED — RESEARCH COMPLETE, IMPLEMENTATION DEFERRED (Nick disposition, 2026-10-08). The atlas survey ran its bounded waves and the corpus is on disk (research/ — wave1, wave1-language-fit, research-methodology, rune-efficiency, textual-craft, tool-calling, uncensored-models, safety-override, quality-tools, workflow-audit, batch-processing, build-mode, contract-testing, interstitial-tools, process_experiences.jsonl). The requirement-coverage work the closure criterion asked for is satisfied at the survey level; every domain reached research-complete, explicit deferral, or documented follow-up. Per-domain closing notes carry the specifics. The IMPLEMENTATION of atlas findings is explicitly deferred to a later programme — the shipped architecture (R2/Phase G kernels, the recall pipeline, the spine) already incorporates the survey's load-bearing conclusions; the novel-architecture findings wait in the corpus for the commissioned implementation cycle. Companion deliverable from the same wave: #411's harness invariants (commit 960af2f) — the repair classes from the research wave are now deterministic checks any future research run can execute.
conductor added the epicresearchmemory-atlas labels 2026-09-19 21:14:49 +01:00

⚠️ Priority gate: this issue has no priority. Assign exactly one of P0 — critical (spine/correctness/blocks), P1 — high (material value or real defect), P2 — medium (quality/consolidation), P3 — low (measurement/deferred). An issue without a priority is not filed.

⚠️ **Priority gate:** this issue has no priority. Assign exactly one of **P0 — critical** (spine/correctness/blocks), **P1 — high** (material value or real defect), **P2 — medium** (quality/consolidation), **P3 — low** (measurement/deferred). An issue without a priority is not filed.
gitea-actions Bot added the custodianmemory labels 2026-09-19 21:14:58 +01:00

⚠️ Priority gate: this issue has no priority. Assign exactly one of P0 — critical (spine/correctness/blocks), P1 — high (material value or real defect), P2 — medium (quality/consolidation), P3 — low (measurement/deferred). An issue without a priority is not filed.

⚠️ **Priority gate:** this issue has no priority. Assign exactly one of **P0 — critical** (spine/correctness/blocks), **P1 — high** (material value or real defect), **P2 — medium** (quality/consolidation), **P3 — low** (measurement/deferred). An issue without a priority is not filed.
gitea-actions Bot added P0 — criticalgovernance and removed research labels 2026-10-08 20:42:50 +01:00
Author
Owner

RE-OPENED (Nick correction, 2026-10-08): this was closed as "research complete, implementation deferred" — but deferred implementation is NOT implementation, and an unimplemented idea stays an issue. The RESEARCH is genuinely complete (corpus in research/); the IMPLEMENTATION has not happened. This issue now tracks the implementation phase: turn the corpus findings into shipped, CI-verified machinery. Open until the ideas are in the codebase.

**RE-OPENED (Nick correction, 2026-10-08):** this was closed as "research complete, implementation deferred" — but deferred implementation is NOT implementation, and an unimplemented idea stays an issue. The RESEARCH is genuinely complete (corpus in research/); the IMPLEMENTATION has not happened. This issue now tracks the implementation phase: turn the corpus findings into shipped, CI-verified machinery. Open until the ideas are in the codebase.
gitea-actions Bot added the ready label 2026-10-22 18:23:18 +01:00

🎓 NEXT: #356 — Memory Research Atlas — Pre-T1 [EPIC] — dependencies satisfied (scheduled sweep); Rune may start.

🎓 **NEXT: #356 — Memory Research Atlas — Pre-T1 [EPIC]** — dependencies satisfied (scheduled sweep); Rune may start.

🎓 NEXT: #356 — Memory Research Atlas — Pre-T1 [EPIC] — dependencies satisfied (closed: #2561); Rune may start.

🎓 **NEXT: #356 — Memory Research Atlas — Pre-T1 [EPIC]** — dependencies satisfied (closed: #2561); Rune may start.

🎓 NEXT: #356 — Memory Research Atlas — Pre-T1 [EPIC] — dependencies satisfied (scheduled sweep); Rune may start.

🎓 **NEXT: #356 — Memory Research Atlas — Pre-T1 [EPIC]** — dependencies satisfied (scheduled sweep); Rune may start.

🎓 NEXT: #356 — Memory Research Atlas — Pre-T1 [EPIC] — dependencies satisfied (closed: #2562); Rune may start.

🎓 **NEXT: #356 — Memory Research Atlas — Pre-T1 [EPIC]** — dependencies satisfied (closed: #2562); Rune may start.

🎓 NEXT: #356 — Memory Research Atlas — Pre-T1 [EPIC] — dependencies satisfied (scheduled sweep); Rune may start.

🎓 **NEXT: #356 — Memory Research Atlas — Pre-T1 [EPIC]** — dependencies satisfied (scheduled sweep); Rune may start.

🎓 NEXT: #356 — Memory Research Atlas — Pre-T1 [EPIC] — dependencies satisfied (scheduled sweep); Rune may start.

🎓 **NEXT: #356 — Memory Research Atlas — Pre-T1 [EPIC]** — dependencies satisfied (scheduled sweep); Rune may start.

🎓 NEXT: #356 — Memory Research Atlas — Pre-T1 [EPIC] — dependencies satisfied (scheduled sweep); Rune may start.

🎓 **NEXT: #356 — Memory Research Atlas — Pre-T1 [EPIC]** — dependencies satisfied (scheduled sweep); Rune may start.

🎓 NEXT: #356 — Memory Research Atlas — Pre-T1 [EPIC] — dependencies satisfied (scheduled sweep); Rune may start.

🎓 **NEXT: #356 — Memory Research Atlas — Pre-T1 [EPIC]** — dependencies satisfied (scheduled sweep); Rune may start.

🎓 NEXT: #356 — Memory Research Atlas — Pre-T1 [EPIC] — dependencies satisfied (scheduled sweep); Rune may start.

🎓 **NEXT: #356 — Memory Research Atlas — Pre-T1 [EPIC]** — dependencies satisfied (scheduled sweep); Rune may start.

🎓 NEXT: #356 — Memory Research Atlas — Pre-T1 [EPIC] — dependencies satisfied (closed: #2599); Rune may start.

🎓 **NEXT: #356 — Memory Research Atlas — Pre-T1 [EPIC]** — dependencies satisfied (closed: #2599); Rune may start.

🎓 NEXT: #356 — Memory Research Atlas — Pre-T1 [EPIC] — dependencies satisfied (closed: #2586); Rune may start.

🎓 **NEXT: #356 — Memory Research Atlas — Pre-T1 [EPIC]** — dependencies satisfied (closed: #2586); Rune may start.

🎓 NEXT: #356 — Memory Research Atlas — Pre-T1 [EPIC] — dependencies satisfied (scheduled sweep); Rune may start.

🎓 **NEXT: #356 — Memory Research Atlas — Pre-T1 [EPIC]** — dependencies satisfied (scheduled sweep); Rune may start.
Sign in to join this conversation.
2 Participants
Notifications
Due Date
No due date set.
Dependencies

No dependencies set.

Reference: conductor/rune#356